Level 2 Trigger Demonstrator Architecture B


DESCRIPTION

In the ATLAS Level 2 trigger demonstrator Architecture B, the S-Link will be used to connect the Trigger Supervisor output with the ROI Distributer Input.

First tests, using a RIO-2 and PMC/S-LINK cards will be started mid March 1997. Those tests will use the LynxOS S-LINK library written by the ATLAS "DAQ prototype-1" team.


DOCUMENTATION


CONTACTS


CERN - High Speed Interconnect - S-LINK
Erik van der Bij - 27 February 1997