[Next] [Previous] [Up] [Top] [Contents]

2 General Description

2.3 General constraints


The ROB is constrained in terms of the board size, the power consumption and the total cost of the board. In addition, there are constraints on the ROB from the interfaces to the Run Control, the Monitor Data Output, the Event Builder and the Level-2 Trigger.


Issue: 1.2 - Revision: 0 - Last Modified: 18 June 1996

[Next] [Previous] [Up] [Top] [Contents]

Generated with CERN WebMaker